PROJECT DETAILS

Project Name - Whitley Road Phase 5
Owner: City of Watauga
Contract Amount: $ 7,697,558.20
 Phase 5


Description of Work:
Remove Existing Concrete Pavement, Concrete Flatwork, Structures, Sign & Utilities
Mass Excavation & Grading
Subgrade Treatment 6” & 8” Lime Stabilized Subgrade – 19,698 SY
Concrete Pavement: 7” Reinforced Concrete Pavement – 17,562 SY
Colored Concrete (Crosswalks): 7” Pavement – 9,015 SF
Asphalt Pavement: 2” Ty D and 5” Ty B – 1,063 SY
Concrete Flatwork: 4” to 6” sidewalk – 19,719 SF
Retaining Walls: Class “C” Formed Concrete - 10 CY
Storm Drain: 6’x3’ to 9’x9’ RCB & 18” to 66” RCP & Storm Structures – 4,131 LF
Sanitary Sewer: 6” to 10” PVC Pipe & Structures – 688 LF
Waterline: 6” to 12” PVC & 24” Welded Steel Casing & Apparatuses – 4,520 LF
Pavement Marking – 11,856 LF
Install Street Signs
Landscaping & Irrigation