MESQUITE SOUTH PARKWAY

back to projects

mesquite, tx

PROJECT OVERVIEW
Contract Amount: $18,025,348.21 

HeadingComplete civil infrastructure reconstruction including demolition, underground utilities, concrete paving, sidewalks, drainage, landscaping, and roadway improvements.

PROJECT DETAILS

Remove Existing Concrete/Asphalt Pavement (28,430 SY), Utilities, Trees, Mailbox, Fire Hydrant, and Signs.
Mass Excavation & Embankment – 14,370 CY
Subgrade Treatment: 6” Flexbase Subgrade – 33,000 SY
Concrete Pavement: 8” Reinforced Concrete Pavement - 30,450 SY
Concrete Flatwork: 6” Trail – 3,783 S, 4” to 8” Sidewalk – 6,117 SY, 6” Driveway – 786 SY, 8” Alley – 850 SY, ADA Ramp – 37 EA
Storm Drain: 18” to 60” RCP – 6,938 LF, 4’x2’ to 8’x5’ Box Culvert – 1120 LF, Storm Structure – 87 EA
Sanitary Sewer Line: 6” to 36” – 8,251 LF, Sanitary Manholes – 34 EA
15” Sanitary Sewer Aerial Crossing in 30” Steel Casing w/ 24” Drilled Shaft – 280 LF
Water Line: 8” DR18 PVC – 8,184 LF
Electrical: Solar Power Lighting 
Decorative Landscaping, Hardscape & Irrigation
Improvements: Street Signs, Pavement Markings