PROJECT DETAILS

2025

Garland Holford Road - City of Garland
                               
Project Type:  Reconstruction
Contract Amount: $14,181,670.00
Estimated Completion Date: August 2025

Description of Work:
 Remove Existing Concrete Pavement, Asphalt Pavement, Trees, Structures, Fence, Guardrails, & Utilities
 4” Temporary Asphalt Pavement – 7,300 SY  
 Mass Excavation – 26,100 CY
 Subgrade Treatment 8” Lime & Cement Stabilized Subgrade – 28,400 SY
 Concrete Pavement: 10” Reinforced Concrete Pavement – 26,400 SY
 Concrete Flatwork: 6” Concrete Bike Trail – 8,504 SY, Concrete Driveway – 650 SY, Decorative Concrete –
1,241 SY, 6” Channel Paving – 1,420 SY
 Retaining Walls: TXDOT Special Retaining Walls - 1,000 CY
 Storm Drain: 6’x4’ to 10’x10’ RCB & 18” to 42” RCP – 4,270 LF
 Water Line: 8” to 16” PVC Waterline – 3,726 LF, Gate Valves - 45 EA
Sanitary Sewer: Minor Adjustments
 Rock Riprap – 1,184 SY