Bonnie Brae St. Phase 4A
(Scripture Roundabout)
Client
City of Denton
Year
2019
Location
DENTON, TX
WORK & VALUE
Heavy Highway | Contract Value: $3,607,106
Remove Existing Asphalt Pavement
Building Demolition
Mass Excavation and Grading: 21,000+ CY
12” Lime Stabilized Subgrade: 12,100 SY
11” Concrete Pavement and Roundabout: 8,800 SY
8” Asphalt Pavement: 4,100 SY
4’x3’ RCB and 18” to 36” RCP Storm Drain: 1,810 LF
6” to 12” PVC and 16” to 20” Ductile Iron Water Line: 1,100 LF
8” PVC Sanitary Sewer Line: 630 LF
Install New Street Lights and Landscaping