5TH STREET DISTRICT
/  Improvements Phase 1 

Owner: City of Sachse
Contract Amount: $2,789,933.00

PROJECT DETAILS



Description of Work:
Remove Existing Asphalt, Concrete Pavement, Trees, & Utilities
Mass Excavation – 3,700 CY
Subgrade Treatment 8” Lime Stabilized Subgrade – 7,319 SY
Concrete Pavement: 10” Reinforced Concrete Pavement – 4,815 SY
Asphalt Pavement: 8” HMAC – 2,450 SY
Decorative Flatwork – 1,150 SY
Storm Drain: 12’x5’ RCB & 18” to 30” RCP – 936 LF
Water Line: 8” PVC Waterline – 600 LF
Water Meter Vaults – 3 EA
Waste Water: 8” PVC Sanitary Sewer – 540 LF
Pavement Markings
Electrical Conduit & Ground Boxes – 2,128 LF
Landscaping & Irrigation